Free Shipping on All Orders!

All Stock Verified!

sales@chiefautomation.com
(877) 629-8191

Allen-Bradley 154-SP1C16NAR

SKU: 154-SP1C16NAR-SOB-USA

Next Day Delivery Available for U.S. Stock

All Parts Come with 12 Month Warranty

New, Surplus, and Refurbished Available

Email to Request a Vendor Quote
Warranty Information

All products (new, surplus, and refurbished) are covered by Chief Automation's 1 Year Warranty. The Manufacturer's Warranty does NOT apply.

Shipping Information

We offer free standard shipping. Products located in the U.S. are eligible for expedited shipping, including next day air.

Payment Methods

We only accept online payments such as Visa, Mastercard, American Express, Discover, etc. All payments are fully secured.

The part number 154-SP1C16NAR is a component from Rockwell Automation, specifically a Starting Torque Controller (STC) designed for low-voltage applications. This component is part of the Allen-Bradley product line and is used to provide a cost-effective, soft-starting solution for low horsepower single- and three-phase squirrel cage induction motors.

Technical Specifications

  • Product Profile: Bulletin 154 STC Starting Torque Controllers
  • Product Number: 154-PP001
  • Certifications: RoHS, China RoHS, cULus Listed, CE Marked

Alarm/ Error Codes

The documentation provided does not include specific alarm or error codes for this component. However, it does mention that the product is designed to provide reliable proven technology with solid-state power poles, which suggests that it is designed to minimize errors and ensure smooth operation.

User Manuals

The user manual for the Bulletin 154 STC Starting Torque Controllers is not directly linked in our research. However, it can be accessed through the Rockwell Automation website or by contacting their technical support team.

Troubleshooting

Troubleshooting information for the Bulletin 154 STC Starting Torque Controllers is not explicitly provided in our research. However, Rockwell Automation's technical support team can assist with troubleshooting and provide guidance on resolving any issues that may arise.

Programming

The component is designed to be easily commissioned with only two adjustments: Initial Torque Setting (10...80%) and Duration of Ramp (0.5…5 sec). This simplicity in programming makes it suitable for a wide range of applications.

Installation

The installation of the Bulletin 154 STC Starting Torque Controllers is straightforward, as it is designed to be easily integrated into existing direct-on-line starters. The component is ideal for adding on to existing systems, which simplifies the installation process.

Go to product

Recently viewed items: