Step-by-Step Guide to Installing the PanelView Plus 7 Terminal
Installing the PanelView Plus 7 Terminal: Step-by-Step Guide
Proper installation of your PanelView Plus 7 terminal is crucial for ensuring its optimal performance and longevity. This guide will take you through the entire process, from safety considerations to mounting and wiring, and finally to the initial startup and terminal reset procedures.
1. Safety Considerations and Hazardous Location Warnings
The first step in installing the PanelView Plus 7 terminal is to understand and adhere to safety guidelines. These include ensuring that the installation site is free from hazardous conditions. The terminal should be installed in a non-hazardous location, unless it is specifically rated for hazardous areas.
- Ensure that all personnel involved in the installation process are aware of and follow safety protocol.
- Always disconnect power before beginning the installation process to prevent electrical shock.
- If the terminal is to be installed in a hazardous location, follow UL and ATEX directives for proper safety measures.
2. Mounting the Terminal
Mounting the PanelView Plus 7 terminal correctly is crucial for its stability and functionality. Here are the steps involved:
Clearances and Panel Cutout Dimensions
Ensure that there is adequate clearance around the terminal for proper ventilation and maintenance. Refer to the manufacturer’s specifications for the necessary panel cutout dimensions to fit the terminal securely.
- Clearances: Maintain at least 50 mm (2 inches) of clearance on all sides of the terminal for proper ventilation.
- Panel Cutout Dimensions: Use the template provided in the manual to mark the panel cutout dimensions accurately.
Mounting Procedure
- Prepare the Panel: Cut the panel according to the dimensions specified. Ensure that the edges are smooth to avoid damaging the terminal.
- Install Mounting Clips: Insert the provided mounting clips into the slots on the terminal. Ensure they are securely fastened.
- Place the Terminal: Carefully place the terminal into the panel cutout. Tighten the mounting clips to secure the terminal to the panel.
- Apply Static Discharge Warning Label: If applicable, apply the static discharge warning label near the terminal to warn operators of potential static discharge.
3. Connecting Power and Network Cables
Properly connecting the power and network cables is essential for the terminal to function correctly.
Connect Power
- Remove the power terminal block from the back of the terminal.
- Strip the insulation from the ends of the power wires according to the specifications mentioned in the manual.
- Insert the stripped wires into the appropriate terminals on the power terminal block and tighten the screws.
- Reattach the power terminal block to the terminal.
- Ensure that the power supply is within the specified voltage range to avoid damaging the terminal.
Connect to a Network
Connecting the terminal to a network allows it to communicate with other devices and systems. Depending on your network topology (Device Level Ring, Linear, or Star), follow these steps:
- Ethernet Ports: Use the Ethernet ports on the terminal to connect to your network.
- Device Level Ring Network Topology: Connect the Ethernet cable to form a ring network, ensuring redundancy and fault tolerance.
- Linear Network Topology: Connect the Ethernet cable in a linear fashion if you have devices connected in a series.
- Star Network Topology: Connect the Ethernet cable to a central switch or hub if you are using a star topology for centralized management.
4. Initial Startup and Terminal Reset Procedures
Once the installation and connections are complete, it's time to power up and configure the terminal.
Initial Startup
- Power on the terminal and wait for it to boot up. Follow the on-screen instructions for the initial setup.
- Configure the terminal’s IP address and other network settings as required.
Resetting the Terminal
If you need to reset the terminal at any point, follow these steps:
- Press and hold the reset button located on the back of the terminal.
- Release the button once the terminal begins to reboot.
- Follow the on-screen instructions to complete the reset process.
By following these steps, you can ensure the safe and effective installation of your PanelView Plus 7 terminal. Proper installation will help in optimizing the performance and longevity of the terminal, providing you with a reliable and efficient user interface for your industrial applications.