“Legacy” doesn’t simply mean old. A PLC becomes legacy as it moves through a predictable lifecycle:

  • Active production – The manufacturer is producing the PLC, releasing updates, and providing full support.

  • Mature support – New development stops, but limited parts and updates remain available.

  • End-of-life (EOL) – Production ceases and official support winds down or ends.

  • Obsolete / legacy – Only secondary markets and third-party repair services remain.

Common indicators that you’re running legacy hardware include discontinued product lines, lack of firmware or software updates, fewer technicians familiar with the platform, and increasingly scarce or expensive spare parts.

Examples of well-known legacy transitions include:

  • Siemens S5 → superseded by S7 platforms

  • GE 90-30 → superseded by PACSystems RX3i

  • Mitsubishi A Series → superseded by Q and iQ-R


Why Do Plants Keep Running Legacy PLCs?

Despite the risks, many facilities continue operating legacy systems—and often for good reason:

  • Proven reliability – Many legacy PLCs were built to survive harsh industrial environments for decades.

  • High migration costs – Full modernization can cost hundreds of thousands—or over a million dollars—depending on I/O count, validation requirements, and downtime.

  • Compatibility challenges – New PLCs don’t always integrate easily with older HMIs, drives, networks, or SCADA/MES systems without gateways.

  • Operator familiarity – Maintenance teams know the logic, quirks, and troubleshooting steps.

  • Downtime avoidance – Shutting down a production line for migration can be more expensive than extending the life of existing equipment.


The Risks of Holding On Too Long

As legacy systems age, risk compounds:

  • Parts scarcity – Discontinued CPUs, power supplies, and I/O modules can take days or weeks to source.

  • Downtime exposure – At $10,000 per hour, a five-day wait for a rare CPU could cost over $1.2 million in lost production.

  • Rising costs – Scarcity often drives pricing to 2–3× original list; some repairs exceed the cost of modern replacements.

  • Cybersecurity vulnerabilities – Unpatched legacy controllers expand attack surfaces and complicate recovery.

  • Workforce gaps – Fewer technicians are trained on older platforms like S5 or SLC environments.

Scarce parts combined with limited expertise increase both repair time and operational risk.


How Long Can You Realistically Keep Running a Legacy PLC?

There’s no universal answer. Service life depends on three main factors:

  • Environment – Heat, vibration, dust, and humidity accelerate failure (e.g., stamping vs. clean assembly).

  • Criticality – A backup conveyor can tolerate risk; a primary bottleneck cannot.

  • Spare availability – On-hand, tested spares significantly reduce risk.

Rule of thumb: Legacy PLCs remain viable until spare availability becomes unpredictable or mean time between failures (MTBF) begins to shrink. Many plants operate 10–20 years past EOL—but annual risk and surprise costs steadily increase.


Repair vs. Replace: A Budget-Smart Framework

When Repair Makes Sense

  • Controls non-critical equipment or has built-in redundancy

  • Warranty-backed repair services are available

  • Spares are reasonably priced and accessible

  • You need time while capital funding for migration is approved

When Replacement Is the Smarter Move

  • Repeated failures cause unpredictable downtime

  • The PLC controls a mission-critical, high-OEE production line

  • Repair costs approach or exceed replacement costs

  • A broader modernization initiative is already underway

Example: A food and beverage plant replaces a GE 90-30 CPU after repeated batch losses. The upfront cost eliminates recurring quality issues and costly downtime.


Practical Steps to Make the Right Call

1) Audit Your Installed Base

Document controller models, age, firmware versions, support status, enclosure conditions, and network interfaces. Inventory available spares and verify whether they’re tested or unknown.

2) Rate Criticality

Score the operational impact of downtime—safety, quality, throughput, and regulatory risk. Identify single points of failure.

3) Track Failures and MTBF

Log fault codes, repairs, and time to restore. Declining MTBF is a clear signal to escalate planning.

4) Build a Repair / Replace Matrix

Asset Criticality Spares On Hand Failure Trend Recommended Action
GE 90-30 – Batch Mixer High No CPU spare MTBF declining Replace controller; prioritize migration budget
Siemens S5 – Utility Skid Medium Limited I/O spares Stable Repair short-term; prepare gateway and upgrade plan

5) Stage Spares and Gateways

For legacy networks like DH+, Remote I/O, or PROFIBUS, stage gateways, cables, and adapters. Validate program backups, comments, and I/O maps.

6) Set Triggers and Timelines

Define hard triggers (e.g., two critical failures in 12 months = initiate replacement). Align upgrades with scheduled outages to minimize production impact.


How Chief Automation Helps

Chief Automation supports facilities at every stage of the legacy lifecycle:

  • Extensive inventory of legacy PLC parts from Siemens, GE, Mitsubishi, and more

  • Same-day emergency shipping to minimize downtime

  • Warranty-backed repair services to confidently extend asset life

  • Free technical support—even after the sale—for real-world troubleshooting

Whether you’re repairing to gain a few more years or replacing to modernize, Chief Automation helps you balance risk, cost, and uptime—without forcing unnecessary upgrades.

Ready to talk through a specific controller or production line?